• -

      Base cover assembly, I/O sub card, and I/O sub card cable removal and installation - ThinkPad T410, T410i

      For access, remove these FRUs in order:

      pd004122_basecover1.jpg

      StepScrew (quantity)Color
      Torque
      1 M2 × 5 mm, wafer-head, nylon-coated (4) Black 0.181 Nm (1.85 kgfcm)
      2 M2 × 10 mm, wafer-head, nylon-coated (1) Black 0.181 Nm (1.85 kgfcm)

      pd004122_basecover2.jpg

      StepScrew (quantity)Color
      Torque
      3 M2 × 3 mm, wafer-head, nylon-coated (3) Black 0.181 Nm (1.85 kgfcm)

      When installing: Make sure that the connector is attached firmly.

      pd004122_basecover3.jpg

      When installing: Make sure that wireless switch is adjusted as shown in figure [a].

      pd004122_basecover4.jpg

      pd004122_basecover5.jpg

      StepScrew (quantity)Color
      Torque
      11 M2 × 3.5 mm, flat-head, nylon-coated (2) Black 0.181 Nm (1.85 kgfcm)

      pd004122_basecover6.jpg

      Cable routing: Make sure that connectors are firmly attached and route the cables as shown in this figure.

      pd004122_basecover7.jpg

      Note: Applying labels to the base cover:

      The new base cover FRU is shipped with a kit containing labels of several kinds. When you replace the base cover, you need to apply the following labels:

      1. Homologation label

      Following labels need to be peeled off from the old base cover, and need to be put on the new base cover.

      1. Windows license label (COA)
      2. Qualcomm Wireless WAN label
      3. Ericsson wireless WAN label
      4. Wireless LAN MAC address label
      5. MAC address label
      6. SIRM labels
      7. Israel label (76.3 mm x 31.6 mm)
      8. Wireless card label (only for Brazil)
      9. Modem label (only for PRC model)
      10. Bluetooth label (only for Brazil)
      11. China wireless WAN label
      12. Israel label (63.5 mm x 19 mm)
      13. Anatel wireless WAN label (only for Brazil)
      14. Vodafone label
      15. Modem AMOM label (only for Brazil)
      16. FCC label
      17. Information label
      18. Serial number label
      19. Asset tag label

      For some models, you also need to apply one or two FCC labels. Check the old base cover; if it has one or two FCC labels, find duplicates of them in the label kit and apply them to the new base cover.

      For the location of each label, refer the following figure:

      pd004122_basecover8.jpg

       

      Purchase parts online

      Was this information helpful?

      Your feedback helps to improve this site.

      • Alias ID: MIGR-74748
      • Document ID: PD004122
      • Last Updated :17 Jun 2014
      • © 2015 Lenovo